1.2 MW Rooftop PV, Kunshan Chemical Park

In Sep 2023, Ruida Energy commissioned a 1.2 MW rooftop PV system at a chemical park in Kunshan, China. The plant uses 2 000 pcs of LY-H72-600 W modules and delivers 1.56 GWh annually, covering 92 % of on-site demand and cutting electricity costs by about USD 0.26 M per year.
First-year degradation is 0.7 %, below the design limit, and the system remains under warranty monitoring.